Runway Set

Runway Install 1For this set build on a public beach, all runway elements were prefabricated off site to limit on-site installation times under heat of the tropical sun.

With an initial survey to assess gradients and tree locations the runway was installed and levelled in 2 days.

Production Designer: Eryl Ellis

 

 

 

 

Runway Prefab 3

Leave a Reply

You must be logged in to post a comment.