CABIN

 

 

 

 

 

 

 

 

 

 

 

Cabin 1The prefabrication of CABIN has commenced with the making of the wall cassettes.

Using the 1:1 mock up we are moving between the CAD drawing, material and detail to further refine the design.

Aiming for a 1 day site build presents an interesting challenge for the logics of construction.

 

 

 

 

 

Cabin 2

Leave a Reply

You must be logged in to post a comment.