Brick KC7808 Link Roof

BKC7808 Link RoofJust completed the lower link roof in preparation for the green roof build up.

This is the second phase of roof construction and requires the upper roof scaffolding to be dismantled and phase 2 scaffolding to be erected.

Leave a Reply

You must be logged in to post a comment.