Annexe Slab

BlindingIn preparation for the casting of the floor slab next week, underground drainage is laid and connected to the common drainage system.
This has been followed by backfilling, compacting and levelling of the sub base.
We have been fabricating the WBP plywood shuttering elements to form the thresholds for the large sliding doors.

Leave a Reply

You must be logged in to post a comment.