FootingsThe excavation for footings do not follow the straight lines of a CAD setting out drawing.
This is due to the imprecise nature of ground.

Levelled with a laser level the trench excavation provides permanent formwork for the mass concrete footings.

Access restrictions to the site required the 20 cubic metres of C35 concrete to be transfered from the ready-mix lorry via the pump lorry.

The whole process was completed within a 2 hour period.

 

 