Annexe Foundations

The foundation work continues with the laying of 7N dense concrete blocks which will be backfilled after the drainage system is laid.

The inner block line forms the permanent shutter and floor level for the reinforced concrete slab work to follow.

To limit material waste the block work order was pretty accurate –

1 block out of 540 blocks left over!

 

 

 

 